A 1,600 m² warehouse, 9 meters high, with two loading docks, two restrooms, and an office.
Located on Segunda Street in La Locería Betania.
The winery is equipped with a fire suppression system
The warehouse is located in a logistics park and features a perimeter wall and a 24/7 security guard post.
Water storage tank, trash collection, and cleaning of common areas.










